We use 'setpoint' in UI. Use it also for documentation and comments. No semantic change.
This commit is contained in:
parent
dcf2542215
commit
95d5771513
9 changed files with 25 additions and 25 deletions
|
|
@ -3492,7 +3492,7 @@ image::images/PlannerWindow1_f20.jpg["FIGURE: Dive planner startup window",align
|
|||
* The most efficient way to create a dive profile is to enter the appropriate values into the table
|
||||
marked _Dive planner points_. The first line of the table represents the duration and the final
|
||||
depth of the descent from the surface. Subsequent segments describe the bottom phase of the dive.
|
||||
The _CC set point_ column is only relevant for closed circuit divers.
|
||||
The _CC setpoint_ column is only relevant for closed circuit divers.
|
||||
The ascent is usually not specified because this is what the planner is supposed to calculate.
|
||||
Add additional segments to the profile by selecting the "+" icon at the top right hand of the
|
||||
table. Segments entered into the _Dive planner points_ table automatically appear in the *Dive
|
||||
|
|
@ -3675,7 +3675,7 @@ the surface. These changes can be deleted by right-clicking the gas change and
|
|||
manually creating a gas change by right-clicking on the appropriate
|
||||
waypoint.
|
||||
|
||||
A non-zero value in the "CC set point" column of the table of dive planner points
|
||||
A non-zero value in the "CC setpoint" column of the table of dive planner points
|
||||
indicates a valid setpoint for oxygen partial pressure and that the segment
|
||||
is dived using a closed circuit rebreather (CCR). If the last manually entered
|
||||
segment is a CCR segment, the decompression phase is computed assuming the diver
|
||||
|
|
|
|||
|
|
@ -3557,7 +3557,7 @@ gestión del oxígeno:
|
|||
|
||||
** CCR Options: Estas opciones determinan la gestión del oxigeno en
|
||||
inmersiones con CCRs
|
||||
*** _Set point por defecto en el Planificador_: Especifica el setpoint de O~2~
|
||||
*** _Setpoint por defecto en el Planificador_: Especifica el setpoint de O~2~
|
||||
de una planificación con CCR. Este dertermina la pO~2~ a mantener durante el
|
||||
buceo. Se pueden añadir cambios a lo largo de la inmersión desde el menú
|
||||
contextual.
|
||||
|
|
@ -3806,7 +3806,7 @@ image::images/PlannerWindow1_f20.jpg["FIGURA: Ventana de inicio del planificador
|
|||
apropiados en la tabla llamada _Puntos del planificador de inmersiones_.
|
||||
La primera línea de la tabla representa la duración y profundidad final
|
||||
de un descenso desde superficie. Los segmentos siguientes describirán la
|
||||
fase de fondo de la inmersión. La columna _CC set point_ solo es relevante
|
||||
fase de fondo de la inmersión. La columna _CC setpoint_ solo es relevante
|
||||
para para buceadores en circuito cerrado.
|
||||
El ascenso, normalmente, no se especifica, ya que esto es lo que se supone
|
||||
que el planificador debe calcular.
|
||||
|
|
|
|||
|
|
@ -3684,7 +3684,7 @@ image::images/PlannerWindow1_f20.jpg["FIGURE: Dive planner startup window", alig
|
|||
values into the table marked _Dive planner points_. The first line of the
|
||||
table represents the duration and the final depth of the descent from the
|
||||
surface. Subsequent segments describe the bottom phase of the dive. The _CC
|
||||
set point_ column is only relevant for closed circuit divers. The ascent is
|
||||
setpoint_ column is only relevant for closed circuit divers. The ascent is
|
||||
usually not specified because this is what the planner is supposed to
|
||||
calculate. Add additional segments to the profile by selecting the "+" icon
|
||||
at the top right hand of the table. Segments entered into the _Dive planner
|
||||
|
|
@ -3875,7 +3875,7 @@ switches will be suggested during the ascent to the surface. These changes
|
|||
can be deleted by right-clicking the gas change and manually creating a gas
|
||||
change by right-clicking on the appropriate waypoint.
|
||||
|
||||
A non-zero value in the "CC set point" column of the table of dive planner
|
||||
A non-zero value in the "CC setpoint" column of the table of dive planner
|
||||
points indicates a valid setpoint for oxygen partial pressure and that the
|
||||
segment is dived using a closed circuit rebreather (CCR). If the last
|
||||
manually entered segment is a CCR segment, the decompression phase is
|
||||
|
|
|
|||