mirror of
https://github.com/subsurface/subsurface.git
synced 2025-01-31 17:03:24 +00:00
User manual: Add text for dive planning CCR with bailout
Three images added as well as text. Signed-off-by: Willem Ferguson <willemferguson@zoology.up.ac.za>
This commit is contained in:
parent
2c53eef50e
commit
e021fc21ea
4 changed files with 25 additions and 0 deletions
BIN
Documentation/images/CCR_b1.jpg
Normal file
BIN
Documentation/images/CCR_b1.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 22 KiB |
BIN
Documentation/images/CCR_b2.jpg
Normal file
BIN
Documentation/images/CCR_b2.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 30 KiB |
BIN
Documentation/images/CCR_b3.jpg
Normal file
BIN
Documentation/images/CCR_b3.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 32 KiB |
|
@ -4020,6 +4020,31 @@ image::images/Planner_CCR.jpg["FIGURE: Planning a CCR dive: setup",align="center
|
|||
Note that, in the _Dive plan details_, the gas consumption for a CCR segment is not calculated,
|
||||
so gas consumptions of 0 liters are the norm.
|
||||
|
||||
==== Planning for CCR bailout
|
||||
|
||||
[icon="images/CCR_b1.jpg"]
|
||||
[NOTE]
|
||||
It is often necessary to plan for a worst-case bailout event in order to ensure sufficient bailout gas to reach the
|
||||
surface, taking into account decompression. This is done by defining a 1-minute segment at the end of the bottom part
|
||||
of the dive, as in the image on the left where a CCR dive to 40m for 21 minutes is planned.
|
||||
|
||||
|
||||
[icon="images/CCR_b2.jpg"]
|
||||
[NOTE]
|
||||
In the dive planner points
|
||||
table, change the _Dive mode_ of this 1-minute segment to _OC_. This signifies bailout. In this case there is bailout to
|
||||
the existing diluent cylinder (assuming this cylinder has sufficient gas). The appropriate pO~2~ and cylinder pressure
|
||||
graphs are shown in the dive profile, as in the image on the left. Note that the setpoint drops to zero after bailout, since
|
||||
this value does not apply to breathed bailout gas.
|
||||
|
||||
|
||||
[icon="images/CCR_b3.jpg"]
|
||||
[NOTE]
|
||||
In order to plan for bailout to an external bailout cylinder, change the _Used gas_ for the 1-minute segment to the
|
||||
appropriate cylinder, as in the example on the left. Note that the cylinder change as well as the bailout are indicated with
|
||||
overlapping icons.
|
||||
|
||||
|
||||
[[S_Replan]]
|
||||
=== Modifying an existing dive plan
|
||||
|
||||
|
|
Loading…
Add table
Reference in a new issue