subsurface/CHANGELOG.md
Robert C. Helling efdc875aa3 Use correct pO2 when computing MOD in equipment tab
The cylinder model is used both in the planner and the
equipment tab. We have three preferences for the pO2 that
is used to compute MOD: In the planner, there is one for
the bottom part of the dive and another one for deco.
Those are set in the planenr UI. There is another value,
controlled in the Tec Prefernces. That one should be
used in the equipment tab rather than the one from
the planner.

Fixes #2984

Signed-off-by: Robert C. Helling <helling@atdotde.de>
2020-09-29 15:46:55 -07:00

7 lines
334 B
Markdown

Use pO2 from prefernces for MOD display in equipment tab
mobile: fix manually adding dives in the past [#2971]
---
* Always add new entries at the very top of this file above other existing entries and this note.
* Use this layout for new entries: `[Area]: [Details about the change] [reference thread / issue]`
# vim: textwidth=100